Project Overview

GES Group was appointed by one of the UK and Ireland's largest Data Centres to upgrade their HV connection, as well as to design, build, install, and commission 6 distribution panels to supply power to their business critical plant, even during power outages, with a UPS.

Project Location

Ireland

Call our Helpdesk

Critical Distribution Panel

Scope of works

Design, Build, Install & Commission a Critical Distribution Panel

Our team in GES Automation designed the distribution boards to the customer specification, including designing the tripping discrimination. Our Site Services team then carried out the installation during shutdowns over a 3 week period, working to tight deadlines and schedules, as the installation and commission was time-critical.

Following the on-site install and commission, GES Group have been appointed to carry out Planned Preventive Maintenance on the system, and our Reactive Team provide 24/7/365 Emergency Breakdown Cover. Our holistic approach to customer power systems ensure all of their needs are met by one provider – GES Group – Building Powerful Partnerships.