The machine was fully stripped and rewound with a full, resin-rich, coil system, and each coil was tested to withstand 23,500 Volts to earth, and between phases.
With the addition of a double flood varnishing process, the windings are superbly protected against external contaminants while remaining flexible enough to cope with the rigorous demands on an engine-driven generator.
The winding process was completed in 6 working weeks, delivering a cost-effective solution to the client, with minimum down-time required.
This Project was delivered in-line with our commitments to Health and Safety, Quality and the Environment through our ISO Management Systems.
This is the first major repair of this nature for this client, and GES look forward to providing this specialist and unique service on further projects in the future.